ARAMCO :: Understanding Quality Codes & Standard References

 

ARAMCO
Quality Codes & Standard References

  • ISO 9001 : 2000
    Quality Management System.
  • SATIP – Saudi Aramco Typical
    Inspection Plan.
  • SAIP – Saudi Aramco Inspection
    Procedure.
  • SAEP – Saudi Aramco Engineering
    Procedure.
  • SAES – Saudi Aramco Engineering
    Standard.
  • SAIR – Saudi Aramco Inspection
    Requirements.
  • SAIC – Saudi Aramco Inspection
    Check list.
  • Saudi Aramco Standard Contractor
    Schedule “Q” (Project Quality Requirements).

 

WHAT IS INSPECTION & TEST PLAN (ITP)?

Is all about document based on detailed manufacturing, fabrication and construction
program that identifies each process description, sets out related sequence of
activities to be inspected, examined and tested with relevant approved
procedures for particular materials, components and assembly. It includes
identification of required documents, acceptance criteria, which is
responsible, the inspection surveillance and the type and level of inspection
including hold, witness and review points of the contractor, sub-contractor and
Saudi Aramco.

INSPECTION & TEST
PLAN should include the following information:

    • Process descriptions.
    • Quality Control Requirements.
    • Notification Requirements for
      Supplier Inspection (min. 10 day calendar days).
    • Responsibilities for Inspection /
      Test.
    • Acceptance Criteria.
    • Verifying Document.
    • Inspection Points (Hold, Witness,
      Review and Surveillance).

What
are Inspection Action Points?

What is Hold Point (H)? 

An
inspection point, defined in an appropriate document, beyond which an Activity
must not proceed without the
approval of the designated organization or authority.

What is Witness (W) Point? 

An
inspection point, defined in an appropriate document, beyond which an Activity
can proceed after notifying the designated organization or
authority. Contractor’s QC Inspector has the full responsibility for
performing detailed Inspection during the work activity.

What is Review Point (R)?  

Defined
in an appropriate document is the point in which a work activity
cannot Proceed without first ensuring the review and approval of
applicable documents Or personnel qualification by a designated organization or
authority

What is Surveillance (S) ?   

QA/QC
organization to monitor work in progress without notice from construction
organization.

Definitions
of Inspection Levels as per (SAER–1972)

– Level
0 – Documentation Requirements only No vendor Inspection required.

– Level
1 – Only Final Inspection is required prior to shipping.
– Level 2 – Includes as minimum, pre-inspection meeting, one or more
Un-specified “in progress” surveillance visits, all witness, hold points,
final inspection and release for shipment
– Level 3 – Same as level 2 except that “in progress” surveillance shall
be on a regular basis ( daily, weekly or bi-weekly )
– Level 4 – Resident inspector continually monitoring the work

What is Non-Conformance? 

An
Activity does not conform with an International Code/Standard.

What is NCR? 

It
stands for Non Conformity Report and A record reporting the variation from
the specified requirements.


What is CAR? 

It
stands for Corrective Action Report, It is a record reporting the action
take to eliminate the effect & causes of an existing Non Conformity defect
or other undesirable situation in order to prevent recurrence.

What is DR? 

It
stands for Deviation Report, A report of the concession granted by client or
owner to certain deviation from project specification.

More Questions : Click below the link

Civil  Qc Inspector Cbt Exam Questions and Answers

Coating  Qc Inspector Cbt Exam Questions and Answers

Electrical Qc Inspector Cbt Exam Questions and Answers

HVAC  Qc Inspector Cbt Exam Questions and Answers

NDT  Qc Inspector Cbt Exam Questions and Answers

Instrumentation  Qc Inspector Cbt Exam Questions and Answers

Mechanical  Qc Inspector Cbt Exam Questions and Answers

Piping  Qc Inspector Cbt Exam Questions and Answers

Plumbing  Qc Inspector Cbt Exam Questions and Answers

Welding  Qc Inspector Cbt Exam Questions and Answers

Permit Receiver Interview Questions and Answers

Scaffolding Inspector Interview Questions and Answers

Leave a Reply