The purpose of this procedure is to ensure that all works regarding electrical and instrumentation shall be done in accordance with the SAUDI ARAMCO standards and all other applicable international codes and standards.
The scope covers the steps to be followed for the installation of electrical and instrumentation intended for permanent installation in the plant.
REFERENCES:
- SAES-B-014 Safety Requirements for Plant and Operation Support Building
- SAES-B-017 Fire Water System Design
- SAES-B-019 Portable, Mobile and Special Fixed Firefighting Equipment
- SAES-B-068 Electrical Area Classification
- SAES-P-104 Wiring Methods and Materials
- SAES-P-100 Basic Power System Design Criteria
- SAEP-P-113 Motor and Generator
- SAES-P-111 Grounding
- SAES-P-121 Transformer and Reactor
- SAES-P-123 Lighting
- IFC Drawing Issued For Construction Drawing
- SATIP-P-111-01 Grounding / Bonding
- SATIP-P-116-03 LV Switchgear and Switchboard
- SATIP-P-116-07 LV Panel boards
- SATIP-P-123-01 Light Fixture and Lighting System
- GI. 6.012 Isolation, Lockout and use of Hold Tags
- Schedule “Q” Quality Assurance and Control, Inspection and testing
- NFPA 70 National Electrical Code
- NEMA National Electric Manufacturer’s Association