Method Statement for Lightning Protection System | Word Format (Doc)
- File Name: MS – Lightning Protection System
- File Type: MS Word
- File Size: 44 KB
This Work Method Statement for Lightning Protection System covers the new installed building and Substations in Saudi Aramco Project.
The purpose of this procedure is to provide for the detailed requirements that shall be followed during Grounding and Bonding system and Instrument Master Reference Grounding Installation.
REFERENCES:
- SAES-P-111 Grounding
- SAES-P-104 Wiring Method and Materials
- Underwriters Laboratory 96, Lightning Protection Components
- National Fire Protection Association 780 Lightning Protection Code
- IFC Details Drawings:
- CONTRACTOR E&I Inspector shall verify all materials and tools as per SAES-P-111 Sec.5.2 A, B, C&D.
- Inspection and test plan must be submitted ahead of time for SAPMT, SAPID and CONTRACTOR.