Method Statement for Electrical Support Installation | Word Format

Method Statement for Electrical Support Installation
  • File Name: WMS – Electrical Support Installation
  • File Type: MS Word
  • File Size: 176 KB

Method Statement for Electrical Support Installation (Word)

This method statement will serve as a minimum guideline to carry out the Installation of electrical support activities for SAUDI ARAMCO PROJECT in accordance with Project Drawings and Specifications.

This method statement will cover the minimum requirements for installation of electrical support and other related electrical works to be applied at the site for ARAMCO REFINERY and PLANTS PROJECTS.

APPLICABLE DOCUMENTS:

  • DEC/JGC Project Specification and Standards
  • ARAMCO Specification and Standards
  • SAEP-302 Instruction for Obtaining a Waiver of a Mandatory Saudi ARAMCO Engineering Requirements
  • SAES-H-101 Approved Protective Coating Systems
  • SAES-P-100 Basic Power System Design Criteria
  • SAES-P-104 Wiring Methods and Materials
  • SAES-P-111 Grounding
  • SAES-B-068 Electrical Area Classification
  • Schedule Q Saudi Aramco Project Quality Requirements
  • Schedule G Material, Tools, and Equipments
  • Schedule D Safety, Health and Environmental Requirements
  • Related Vendors Installation and maintenance manuals and /or specifications

International Standard:

  • NEMA VE2 Cable Tray Installation Guidelines
  • ASTM A123 Standard Specification for Zinc (HDG)
  • Latest Revision of the following Documents shall be used
  • Vendor Drawing
  • Latest Approved Drawing
  • Saudi ARAMCO Safety, Health and Environmental Standard
  • Construction safety manual
  • General Instructions (G.I’s) at the work site

Reference: Schneider Electrichttps://www.se.com/sa/en/work/products/product-launch/electrical-installation-guide/

Download Now

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top